Tuesday, December 27, 2011

Fireball!

Back to the north end of the layout and the continuation of construction on the Fireball Distillery.

After relocating the road between the building and the cliff face, I also needed to make room for the distillation tank.  The tank is located in the V formed by the siding and the mainline.

In this phase, I've used a Life Like Mount Vernon manufacturing plant - customized to the shape of the site - for the distillery main building.  There is a small office attached to the front - with the loading dock between the office and the road.

The distillation tank - to be connected to the main building with overhead piping - completes the facility.







Next time:  Pipes & Paint


No comments:

Post a Comment