Reworking the track on the north end of the layout - with the total number of turnouts remaining eight
The Changes:
** Moved one switch from inside the oval to outside
** Realigned the switch that had been facing eastbound so it is now facing northbound
** Added several rerailers inside the tunnel beneath the town of Metallikahmish Bay
** Rordered the switches for more logical operation. Switch #1 is now the left hand track that goes inside Onceler's Thneed Factory. Then they run from #2 to #8 counterclockwise around the layout starting with #2 right above FDHQ.
These adjustments leave more room for a couple of small industries on the north side of the bay while also making room for a broader plateau supporting the town of Metallikahmish Bay.
Next time: HWPS Construction Resumes
The Changes:
** Moved one switch from inside the oval to outside
** Realigned the switch that had been facing eastbound so it is now facing northbound
** Added several rerailers inside the tunnel beneath the town of Metallikahmish Bay
** Rordered the switches for more logical operation. Switch #1 is now the left hand track that goes inside Onceler's Thneed Factory. Then they run from #2 to #8 counterclockwise around the layout starting with #2 right above FDHQ.
Next time: HWPS Construction Resumes
No comments:
Post a Comment