Reworking the track on the north end of the layout - with the total number of turnouts remaining eight

The Changes:

**  Moved one switch from inside the oval to outside
**  Realigned the switch that had been facing eastbound so it is now facing northbound
**  Added several rerailers inside the tunnel beneath the town of Metallikahmish Bay
**  Rordered the switches for more logical operation. Switch #1 is now the left hand track that goes inside Onceler's Thneed Factory. Then they run from #2 to #8 counterclockwise around the layout starting with #2 right above FDHQ.


These adjustments leave more room for a couple of small industries on the north side of the bay while also making room for a broader plateau supporting the town of Metallikahmish Bay.