Saturday, December 10, 2011

Fireball Rework

Jumping over to the other side of the bay for a bit to rework the Fireball Distillery property lines.  Have decided to put a narrow, rickety old highway bridge across the bay.  I want the road line to continue from there to the north end of the layout - right in front of the tunnel and across what is now the Fireball property line/factory location.

Steps logged in this set of photos:

  1. Remove straight track and replace with a curved section
  2. Remove all of the original subfoundation
  3. Put in a road subfoundation made of two layers of BBQ skewers
  4. Build the road on top of that from styrene
  5. Built a ramp down from the road to the loading dock - with a smaller retaining wall between the road and the truck parking lot
  6. Take apart the existing factory and test fit the walls to the new property alignment.  The distillery will fill the property line - with the siding going inside the building as before.







Next time:  Passenger Station Wrap Up

No comments:

Post a Comment